If you need assistance completing the form, please review the Becomming a Micro Generator page for the step by step process.
Required information before completing the form
Ensure you have the following information and documents readily available:
Document | Example |
---|---|
Site line diagram | View example |
Site plan / real property report | View example |
Drawings of the micro-generation system | View example |
Equipment specification from the manufacturer | View example |
Documentation verifying thatthe generator mets the less than or equal to 418kg per MWh limit specified in the Micro-Generation Regulation (combined heat and power unit) | View example |
Third party consent form (only needed if a contractor/consultant is acting on behalf of the customer) | View example |
A copy of the City of Edmonton electrical permit issued and may include a copy of the building permit issued for site construction. | View example |
Ensure you have met the following compliance requirements for the project:
Micro-Generation form